
|
Facility & Implements Six-lane, lightly banked 200-meter Mondo Track, eight-lane straightaway. Track events Use of starting blocks is restricted to those provided by the facility. All shoes will be checked, with only 1/4" pyramid spikes or flats permitted, no hexagonal elements. Acceptable spike implements will be available at the meet. There will be no 27 inch hurdles. Please refer to the implement rules that went into effect as of 4/1/2001. Throwing events There will be one weight and two shot circles, throwing onto a synthetic surface. Soft-shell shot and bag weight implements only, except for the Superweight (men 30-69), which will be contested outdoors. Jumping events Starting heights will be determined by facility equipment and meet officials. Minimum High Jump height will be 2 feet 8 inches; minimum Pole Vault height will be approximately 4 feet. Vaulters should bring their own poles. |